High capacity bilge pump project

image

image

image

Done.  The pump was installed and plumbed about a year ago but, now it has its own dedicated thru Hull hole instead of sharing with the lower capacity in the sump bilge pump. 

On our next haul out we plan on removing the old sealed off generator and octopus looking bilge opening, currently plugged. 

image

And now on to a smellier project.  Forward holding tank needed just another three turns.  Operator error I assume and I’m the operator.

image

About trawlercat

Retired and now moving on from the cruising life jeeps, adventure bike, gardening, and travel. Always in search of the next great adventure!
This entry was posted in Uncategorized and tagged , . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s