And yet another project list

BARE ASSET PROJECT LIST:           PRIORITIZED A/B/C

TUESDAY – TRAVEL DAY

Checklist:  Lucy’s food; wet weather gear; SUV emergency equipment;

ARRIVE WEDNESDAY

WORKDAY 1

  1.  DEWINTERIZE
  2. Water batteries
  3. Schedule TACH install
  4. Schedule Racor meter install in lower helm
  5. Measure water tank size
  6. Contact Ernie Riddle – A
  7. Dinghy chocks – C
  8. Raise mast, size pelican hooks to hardtop
  9. Cut mast to size
  10. Install handrails stainless

WORKDAY 2

  1.  Inspect holding tanks – C
  2. Remove waterbox muffler exhaust from the old genset – B
  3. 4
  4. 5
  5. 6
  6. 7
  7. 8
  8. 9
  9. 10.
  10. 2012-06-06 11.12.34
  11. Costs of doing business:  On this trip up to the boat in my wife’s Prius I took a friend (Carlos) to help me.  His pay for all the most excellent help turned out to be this Yanmar engine.  A friend Scott was updating his engine to a new Yanmar and so I purchased this Yanmar and brought it down in the Prius.  Amazing the things you can fit in one of these cars.  This Yanmar is now happily residing in a 30′ Santana.

About trawlercat

Retired and now moving on from the cruising life jeeps, adventure bike, gardening, and travel. Always in search of the next great adventure!
This entry was posted in Boat Projects, Uncategorized and tagged , . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s